· With the power supply off, both meter pointers should be over the zero indication on each meter face. If they are not, turn the mechanical zero-adjust screws at the bottom of each meter until the pointers are properly aligned.
Ancillary Equipment Needed
VTVM (optional)
* * * * * * *
NOTES
· Remove all jumper wires between the chassis ground and common ground terminals.
· Remove all loads from the supply terminals.
· All circuit board mounted control adjustments are made from the top of the board, front to rear (see Figure 1).
* * * * * * *
ZERO SET & 400V SET ADJUSTMENTS
( ) Set the POWER switch to the OFF position.
( ) Set the B+ OUTPUT control maximum counter-clockwise.
( ) Set the C- OUTPUT control maximum counter-clockwise.
( ) Set the VOLTMETER switch to the B+ VOLTS position.
( ) Set the POWER switch to the STANDBY position. Allow the tubes to come up to operating temperature.
( ) Set the ZERO VOLTAGE ADJUST control [second from left on circuit board] maximum counter-clockwise.
( ) Set the 400 VOLT ADJUST control [first from left on circuit board] maximum clockwise.
( ) Set the POWER switch to the ON position.
· There should be 0 output indicated on the current meter.
Meter Calibration without a VTVM
( )* Set the high voltage B+ OUTPUT control maximum counter-clockwise.
( )* Adjust the ZERO VOLTAGE ADJUST control until the voltage meter reads 0 V.
( )* Set the high voltage B+ OUTPUT control maximum clockwise.
( )* Adjust the 400 VOLT SET control clockwise until voltage meter reads 400 V.
· Because the ZERO SET and the 400 VOLT SET controls interact with each other, it will be necessary to repeat the above four steps* until no meter changes are observed.
( ) Set the high voltage B+ OUTPUT control maximum counter-clockwise.
Meter Calibration using a VTVM
( ) Set the high voltage B+ OUTPUT control maximum counter-clockwise.
( ) Set the POWER switch to the STANDBY position.
( ) Set the VTVM on a voltage scale capable of reading 400 VDC.
( ) Connect the VTVM to the B+ output terminals.
( ) Set the POWER switch to the ON position.
* * * * * * *
( )* Set the high voltage B+ OUTPUT control maximum counter-clockwise.
( )* Adjust the ZERO VOLTAGE ADJUST control until the panel meter voltage reads 0 V.
( )* Adjust the high voltage B+ OUTPUT control until the VTVM reads 400 VDC.
( )* Adjust the 400 VOLT SET control clockwise until the panel voltage meter reads 400 V.
· Because the ZERO SET and the 400 VOLT SET controls interact with each other, it will be necessary to repeat the above four steps* until no meter changes are observed.
( ) Set the high voltage B+ OUTPUT control maximum counter-clockwise.
( ) Set the POWER switch to the STANDBY position.
( ) Disconnect the VTVM from the B+ terminals.
( ) Set the POWER switch to the ON position.
NEGATIVE BIAS VOLTAGE VERIFICATION
( ) Set the C- OUTPUT control maximum counter-clockwise.
( ) Set the VOLTMETER switch to the C- VOLTS position.
( ) Set the C- OUTPUT control maximum counter-clockwise, meter should read 0 V.
( ) Set the C- OUTPUT control maximum clockwise, meter should read over -100 V.
( ) Set the C- OUTPUT control maximum counter-clockwise.
( ) Set the POWER switch to the OFF position.
( ) Set the VOLTMETER switch to the B+ VOLTS position.
( ) Calibration procedure is completed.