Heathkit Model IP-17

Regulated Power Supply


Calibration Procedure

 

·         With the power supply off, both meter pointers should be over the zero indication on each meter face.  If they are not, turn the mechanical zero-adjust screws at the bottom of each meter until the pointers are properly aligned.

 

Ancillary Equipment Needed

 

VTVM (optional)

 

* * * * * * *

NOTES

 

·         Remove all jumper wires between the chassis ground and common ground terminals.

 

·         Remove all loads from the supply terminals.

 

·         All circuit board mounted control adjustments are made from the top of the board, front to rear (see Figure 1).

 

* * * * * * *

ZERO SET & 400V SET ADJUSTMENTS

 

(    )         Set the POWER switch to the OFF position.

 

(    )         Set the B+ OUTPUT control maximum counter-clockwise.

 

(    )         Set the C- OUTPUT control maximum counter-clockwise.

 

(    )         Set the VOLTMETER switch to the B+ VOLTS position.

 

(    )         Set the POWER switch to the STANDBY position. Allow the tubes to come up to operating temperature.

 

(    )         Set the ZERO VOLTAGE ADJUST control [second from left on circuit board] maximum counter-clockwise.

 

(    )         Set the 400 VOLT ADJUST control [first from left on circuit board] maximum clockwise.

 

(    )         Set the POWER switch to the ON position.

 

·         There should be 0 output indicated on the current meter.

 

Meter Calibration without a VTVM

 

(    )*       Set the high voltage B+ OUTPUT control maximum counter-clockwise.

 

(    )*       Adjust the ZERO VOLTAGE ADJUST control until the voltage meter reads 0 V.

 

(    )*       Set the high voltage B+ OUTPUT control maximum clockwise.

 

(    )*       Adjust the 400 VOLT SET control clockwise until voltage meter reads 400 V.

 

·         Because the ZERO SET and the 400 VOLT SET controls interact with each other, it will be necessary to repeat the above four steps* until no meter changes are observed.

 

(    )         Set the high voltage B+ OUTPUT control maximum counter-clockwise.


Meter Calibration using a VTVM

 

(    )         Set the high voltage B+ OUTPUT control maximum counter-clockwise.

 

(    )         Set the POWER switch to the STANDBY position.

 

(    )         Set the VTVM on a voltage scale capable of reading 400 VDC.

 

(    )         Connect the VTVM to the B+ output terminals.

 

(    )         Set the POWER switch to the ON position.

 

* * * * * * *

 

(    )*       Set the high voltage B+ OUTPUT control maximum counter-clockwise.

 

(    )*       Adjust the ZERO VOLTAGE ADJUST control until the panel meter voltage reads 0 V.

 

(    )*       Adjust the high voltage B+ OUTPUT control until the VTVM reads 400 VDC.

 

(    )*       Adjust the 400 VOLT SET control clockwise until the panel voltage meter reads 400 V.

 

·         Because the ZERO SET and the 400 VOLT SET controls interact with each other, it will be necessary to repeat the above four steps* until no meter changes are observed.

 

(    )         Set the high voltage B+ OUTPUT control maximum counter-clockwise.

 

(    )         Set the POWER switch to the STANDBY position.

 

(    )         Disconnect the VTVM from the B+ terminals.

 

(    )         Set the POWER switch to the ON position.

 

NEGATIVE BIAS VOLTAGE VERIFICATION

 

(    )         Set the C- OUTPUT control maximum counter-clockwise.

 

(    )         Set the VOLTMETER switch to the C- VOLTS position.

 

(    )         Set the C- OUTPUT control maximum counter-clockwise, meter should read 0 V.

 

(    )         Set the C- OUTPUT control maximum clockwise, meter should read over -100 V.

 

(    )         Set the C- OUTPUT control maximum counter-clockwise.

 

(    )         Set the POWER switch to the OFF position.

 

(    )         Set the VOLTMETER switch to the B+ VOLTS position.

 

(    )         Calibration procedure is completed.