·         If using the unit as a portable instrument, install a fresh set of 9-volt batteries and set the SOURCE switch (on rear of unit) to the BATT position.

 

·         If powered using the IPA-5280-1 AC Power Supply, set the SOURCE switch (on rear of unit) to the LINE position.

 

·         Disconnect all external components from the front panel terminals.

 

Ancillary Equipment Needed

 

VTVM

Demodulation probe

Audio generator

 

* * * * * * *

RESISTANCE CHECKS

Refer to Pictorial 3-3

Manual page 18

 

(    )         Temporarily remove the 9-volt batteries if installed.

 

(    )         Set the SOURCE switch [on rear of unit] to the BATT position if connected to an IPA-5280-1.

 

(    )         Set the FUNCTION switch to the OFF / SPKR SUB position.

 

(    )         Set the VTVM FUNCTION switch to the OHMS position.

 

(    )         Set the VTVM RANGE switch to the R x 100 position.

 

(    )         Connect the VTVM common lead to the chassis.

 

(    )         Set the FUNCTION switch to the AUDIBLE / V/W position.

 

(    )         Touch the ohmmeter probe to SW1 wafer 2 lug 1.

               [Red wire from switch to connection C on the circuit board]

 

(    )         Meter indication should be 50 W or higher.

 

(    )         Touch the ohmmeter probe to SW1 wafer 2 lug 3.

               [Green wire from switch to connection F on the circuit board]

 

(    )         Meter indication should be 100 W or higher.

 

(    )         Set the FUNCTION switch to the OFF / SPKR SUB position.


* * * * * * *

HUM INJECTION TEST

Refer to Pictorial 6-4

Manual page 27

 

(    )         Install fresh batteries (if using them) and set the SOURCE switch to the BATT position.

 

(    )         If the unit is powered using a IPA-5280-1, set the SOURCE switch to the LINE position.

 

(    )         Set the LEVEL control to maximum counter-clockwise.

 

(    )         Connect the unit’s test probe (demodulation probe) to the input terminals.

 

(    )         Set the test probe’s tip to the DC position.

 

(    )         Set the FUNCTION switch to the SIGNAL TRACER position.

 

(    )         Wait a few seconds for the unit to stabilize.

 

(    )         Adjust the LEVEL control until a hum is heard from the speaker.

 

·         Do not adjust the LEVEL control any higher than necessary to save battery life.

 

(    )         Touch the tip of the test probe to your fingers; the hum level should increase.

 

(    )         Set the probe tip to the diode (demodulation) position.

 

(    )         Touch the tip of the test probe to your fingers; the hum should change slightly in tone.


* * * * * * *

OSCILLATOR TEST

Refer to Pictorial 6-5

Manual page 28

 

(    )         Set the FUNCTION switch to the AUDIBLE / V/W position.

 

(    )         Set the test probe’s tip to the DC position.

 

(    )         Touch the test probe to the chassis; a tone should be heard from the speaker.

 

(    )         Touch the test probe to SW1 wafer 2 lug 3; a tone higher in frequency should be heard from the speaker.

               [Green wire from switch to connection F on the circuit board]

 

(    )         Set the probe tip to the diode (demodulation) position.

 

(    )         Touch the tip of the test probe to the chassis; there should be no tone heard.

 

(    )         Disconnect the test probe from the input terminals.


* * * * * * *

SPEAKER SUBSTITUTION TEST

Refer to Pictorial 6-6

Manual page 29

 

(    )         Set the FUNCTION switch to the OFF / SPKR SUB position.

 

(    )         Connect an audio generator to the SPKR terminals.

 

(    )         Set the generator frequency to 1000 Hz.

 

(    )         Adjust the audio generator output until a tone is heard from the speaker.

 

(    )         Disconnect the audio generator.

 

(    )         Calibration procedure is complete.